TSK has opened a tender to complete U Loděnice bridge, structure SO205 in the Libeň bridge complex. Completion is intended to enable trams to return between Libeň and Holešovice while reconstruction of the other sections is prepared.
The contractor is to finish the existing structure, including the deck, drainage, associated utilities, roads and pavements, and preparation for tram track installation. Basic work is estimated at CZK 197 million excluding VAT. Up to another CZK 40 million is conditional on possible additional work, not an automatic entitlement for the contractor.
Bids are due by 10:00 on 19 November 2026. TSK’s announcement does not set a tram reopening date; the tender does not mean the connection has already resumed.

